3PC Threaded Ball Valve With ISO5211 Mounting Pad

Material:
SS304(CF8/SCS13/1.4301) SS316(CF8M/SCS14/1.4401)
Size:
1/4"-4"
Pressure:
PN63
Type:
Ball
Port:
Full Port
Package:
Plastic bag, inner box, outter box, Plywood case
Connection Form:
BSP/BSPT/NPT/DIN259/DIN2999 Thread
Payment Terms:
T/T 30% prepaid, the balance should be paid before shipment
Contact Now
3PC Threaded Ball Valve With ISO5211 Mounting Pad

Main Materials:

Body :SS304/SS316/WCB

Cap: SS304/SS316/WCB

Seat: PTFE/PPL/RPTFE

Washer :PTFE/PPL/RPTFE

Stem: SS201/SS304/SS316

Ball :SS304/SS316

Gasket: PTFE/PPL/RPTFE

Packing :Depends

Gland: SS304/SS316

Bolt: SS304/SS316

 

Features:

1. Open and close without friction.

2. Mounted structure.

3. Single valve seat design

4. Low torque design.

5. Wedge seal structure.

6. Self-cleaning structure of sealing surface.

 

Advantages:

1.Close and reliable, the ball valve sealing surface material is widely used plastic, good sealing, in the vacuum system has also been widely used.

2.Easy to operate, quick to open and close, from full open to full close as long as the rotation 90°, convenient for remote control.

3.Easy maintenance, ball valve structure is simple and replacement are more convenient.

 

Shipment&Payment:

We will deliver goods within 30-60 days after we received your order from Ningbo port or Shanghai Port. But the delivery time is according to the size of your order.

We usually accept 30% in advance by T/T. The balance should be paid before shipment. If you’d like other payment practice, you can contact us to get more details.

 

After-sales services:

1. Professional maintenance personnel shall first check the fault, and then report the required expenses. The customer shall repair and remove the fault after accepting the quotation.

2. In the selection of accessories, we strictly control the quality, accessories are unified from the regular manufacturers procurement, quality assurance, put an end to the use of fake and shoddy accessories.

3. In terms of maintenance or installation, strictly follow the maintenance procedures and operating procedures to ensure the maintenance quality.

4. All products of our company shall be subject to warranty, and the warranty period shall be twelve months. If the user's machine breaks down again due to the quality problem of the accessories within the warranty period, our company shall be responsible for the free maintenance, so as to eliminate the worries of customers.

 

FAQ:

Q:What are the installation steps?

A:1. Rinse and clean when the valve is fully open.

    2. Before installation, the whole machine should be tested according to the prescribed signal, and the online            installation can only be conducted after passing the test.

    3. Before preparing to connect with the pipe, the valve body and ball must be washed and cleaned to prevent          residual impurities in the pipe from damaging.

    4. During installation, in order to avoid damage to the actuator and accessories, please do not use the                      actuator part of the valve as the lifting point.

    5. This type of valve should be installed in the horizontal or vertical direction of the pipeline.

    6. The pipeline near the installation point shall not have low sag or bear external force, and the pipeline                  bracket or support can be used to eliminate the deviation of the pipeline.

    7. After connecting with the pipe, please cross-lock the connection bolt with the specified torque.

Q:How do you ship the goods and how long does it take to arrive?

A:We usually ship by sea. It usually takes 30 days to arrive.

Q:Do you offer guarantee for the products?

A:Yes, we offer 1 year warranty to our products.

Feedback